This project, which consisted of the removal of 14” diameter overhead steam lines, three 10,000  gallon holding tanks, six 5,000 gallon chemical mixing tanks, was accomplished with cutting torches and other types of specialized equipment to remove the stainless steel tanks.  The project ran concurrent with daily operations of the plant so that there was no down time.